Construction Progress Update 4

I can’t believe I haven’t blogged about house construction since November!

While construction did continue throughout the winter, I guess most of the stuff wasn’t “blog” or “picture” worthy (if this was a more technical blog maybe it would be).  Insulation, vapour barrier, plumbing, electrical and ducting don’t create the same excitement as say…….SIDING!

2003-12-31 001

South Facing

Now the house is taking on the look of a home.

2003-12-31 003

South and West Facing

The North and East walls have yet to be finished.

2003-12-31 004

North Facing

We ended up going with a vinyl board and batten style of siding.  Our original thought was to have the house sided with stained or painted cedar boards and battens.  However, that would have required more work and maintenance in the long term, something neither one of us was prepared to deal with.

Drywall is right around the corner, stay tuned.

Kelly

One thought on “Construction Progress Update 4

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s