Construction Progress Update 1

With the great weather we have been having since construction started in August, the house has been progressing quite well, faster than I can write a blog post about it.  Framing has started and it looks like this:

Progress pic 1

North Side

progress pic 2

South Side

progress pic 3

View out the dining area window.

Framing of the second floor has started and I will hopefully have pictures soon. Meanwhile, on the the other side of the yard, the studio/shop is slowly taking shape.

studio 1

Studio Front

studio 2

Studio Back

Kelly

 

 

One thought on “Construction Progress Update 1

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s